
Data Center
Japan
Tokyo No.4 Data Center

Location
- Tokyo, Japan
- 70-minute drive from Narita International Airport
- 8-minute walk from the nearest train station
Features and Benefits
Convinient Location
Only 15 minutes away from Tokyo station and an 8 minute walk from the nearest train station. You can also walk to the data center on foot from Tokyo Metropolitan Bisiness District even if public transportation stops in cases of emergency.
Seismic Isolation
The structure of Japan Tokyo No. 4 Data Center is seismically isolated and can reduce 80% of seismic shocks during an earthquake. Isolation can keep the impact of an earthquake to the minimum, protecting the building, facilities and equipment, even in the case of an earthquake as big as the Great Eastern Japan Earthquake in 2011. Major facilities for power and air-conditioning are configured for redundancy to ensure high reliability.
Carrier Neutral
The Data Center is a carrier neutral data center providing a variety of network services by different carriers. This gives you the flexibility to construct a network environment with network service provider redundancy to improve business continuity planning (BCP).
Power
- Dual path
- UPS in N+1 configuration
- Gas turbine generator in N+1 configuration
- Dual power feed to each rack
- Power supply: Up to 6 kVA/rack
Air-conditioning
- Water-cooling system
- N+1 redundant configuration
Security
- Pre-registration
- Photo identification
- IC card authentication
- Biometric authentication
- Anti-tailgating system
Certification
- ISO 9001
- ISO 14000
- ISO 20000
- ISO 27001
- ISO 22301
- Privacy Mark (JIS Q 15001)
- COPC-2000
Other facilities
- Meeting room
- parking space
- office space for customers
Related Link
Tokyo No.5 Data Center

Location
- Tokyo, Japan
- 1 hour drive from Narita International Airport
- 2-minute walk from the nearest train station
Features and Benefits
Purpose-build Data Center
Tokyo No.5 Data Center is one of the largest self-designed, purpose-built data centers in Tokyo.
Great Access
The Data Center is located within 2.5 km from Otemachi (central Tokyo) area.
Seismic Isolation
Seismically isolated structure ables to withstand earthquakes of intensity as much as the Great Eastern Japan Earthquake in 2011. This was proven during the earthquake occured and the movement of the Data Center building was only 43 mm radius.
Power
- Dual path
- UPS in N+1 or 2(N+1) configuration
- Gas turbine generator in N+1 configuration
- Dual power feed to each rack
- Power supply: Up to 4 kVA/rack
Air-conditioning
- Air-cooling system
- N+1 configuration
Security
- Pre-registration
- Photo identification
- IC card authentication
- Biometric authentication
- Anti-tailgating system
Certification
- ISO 9001
- ISO 14000
- ISO 20000
- ISO 27001
- ISO 22301
- Privacy mark (JIS Q 15001)
- COPC-2000 certified
Other facilities
- Meeting room
- Office space for customers
Related Link
Tokyo No.6 Data Center

Location
- Tokyo, Japan
- 1 hour drive from Narita International Airport
- 7-minute walk from the nearest JR line station
Features and Benefits
Largest in Tokyo
Only a 7-minute walk from the nearest train station and accessible from multiple train stations, diverse access routes are available even in case of emergency. The Tokyo No. 6 Data Center is built on stable hard ground and is 10 km from Tokyo Bay, and 1.5 km from the closest river. Tokyo No. 6 also has a large-scale, fully-equipped office building on-site for use during systems monitoring, maintenance and business continuity planning (BCP) operations.
Seismically Isolated
The Data Center can reduce seismic shocks to one-fifth their force, preventing adverse affects on your equipment and on our facilities and buildings. Furthermore, all major equipment has redundant configurations. The communications path is connected directly to a secure earthquake-proof cable tunnel.
PUE 1.2
It has achieved the highest level of power usage effectiveness (PUE) of all data centers in Japan. This has been achieved by adopting water-cooled air conditioning with outdoor air cooling system, rotary UPS, which minimizes power loss, and advanced air flow management system.
50% Cost Saving
With its superior efficiency and space-saving structure enable cost reduction of up to 30 percent per rack. Structural efficiencies enable 50 percent more devices per rack compared to similar data center facilities. This can reduce your operating costs by as much as 50 percent compared to other data centers.
Power
- Dual Path
- UPS in N+1 or 2(N+1) configuration
- Rotary UPS
- Dual power feed to each rack
- Power supply: Up to 6kVA/rack
Air-conditioning
- Water cooling system
- N+1 configuration
Security
- Pre-registration
- Photo identification
- IC card authentication
- Biometric authentication
- Anti-tailgating system
Certification
- ISO 9001
- ISO 27001
- ISO 20000
- ISO 22301
- ISO 14000
- Privacy mark (JIS Q 15001)
- COPC-2000 certified
Other facilities
- Meeting room
- Parking space
- Office space for customers
Related Link
Tokyo No.9 Data Center

Location
- Tokyo, Japan
- 40-minute drive from Tokyo International Airport
- 15-minute walk from the nearest JR line station
Features and Benefits
Great Access
Tokyo No.9 Data Center is located in the Tokyo metropolitan area and it has multiple accessibility of public transportations.
BCP office
This Data Center has fully equipped office building for use as a system monitoring center or a buisiness countinuity planning (BCP) office.
Business Ready
There are variety of amenities to satisfy customer comfort such as cafeteria, fitness gym, customer lounge, shower room, and more.
Power
- Dual Path
- UPS in N+1 configuration
- Gas turbine engine
- Dual power feed to each rack
Air-conditioning
- Water cooling system
Security
- Pre-registration
- Photo identification
- IC card authentication
- Biometric authentication
- Anti-tailgating system
Other facilities
- Meeting room
- Parking space
- Office space for customers
Related Link
Yokohama No.1 Data Center

Location
- Yokohama, Kanagawa, Japan
- 50-minute drive from Tokyo International Airport (Haneda Airport)
- 15-minute walk from the nearest train station
Features and Benefits
DR Site
It's perfect for a business countinuity planning. Ideal location of disaster recovery including floods and earthquake.
Business Ready
Yokohama No.1 Data Center is a high-performance data center perfect for business continuity planning (BCP).
High Quality
This Data Center has full control over facility design and operations ensures high quality service and flexibility for customization.
Power
- Loop path
- UPS in N+1 or 2(N+1) configuration
- Gas turbine generator in N+1 configuration
- Dual power feed to each rack
- Power supply: Up to 6 kVA/rack
Air-conditioning
- Air-cooling system
- N+1 configuration
Security
- Pre-registration
- Photo identification
- IC card authentication
- Biometric authentication
- Anti-tailgating system
Certification
- ISO 9001
- ISO 14000
- ISO 20000
- ISO 27001
- ISO 22301
- Japanese SAS70
- BS7799
Other facilities
- Meeting room
- Parking space
- Office space for customers
Osaka 5 Data Center

Location
- Osaka, Japan
- 1 hour drive from Kansai International Airport
- 7-minute walk from the nearest train station
Features and Benefits
Great Access
Osaka 5 Data Center stands only 7 minutes away from the nearest train station and is accessible within 20 minutes from the JR Shin-Osaka station. You can reach the data center on foot from metropolitan bisiness district in Osaka, even when all the public transportation halts in an emergency. The data center is located 6 km away from Osaka Bay and 3 km away from the closest river.
Seismic Isolation
With its seismic isolation structure, the Data Center can reduce 80 percent of seismic shocks from an earthquake. This minimizes the impact of an earthquake and protects the building, facilities and computer equipment, even in an earthquake as big as the Great Eastern Japan Earthquake in 2011 or Great Hanshin Earthquake in 1995. The data center has a direct connection to a robust seismic cable tunnel that protects lead-in cables from damage by earthquakes, providing highly reliable and secure network connectivity.
PUE 1.3
It has achieved PUE 1.3 by adopting a variety of ecological initiatives, including installation of energy efficient water-cooling system, outdoor air-cooling system and cooling wall system.
Cable Tunnel
Communications routes are laid from four directions, include connected directly to secure earthquake-proof cable tunnel, with no damage from past major earthquakes.
Power
- Dual path
- UPS in N+1 configuration
- Gas turbine generator in N+1 configuration
- Dual power feed to each rack
- Power supply: Up to 15 kW/rack
Air-conditioning
- Water-cooling system
- N+1 redundant configuration
Security
- Pre-registration
- Photo identification
- IC card authentication
- Biometric authentication
- Anti-tailgating system
Certification
- ISO 9001
- ISO 20000
- ISO 27001
- PCI DSS
Other facilities
- Meeting room
- Office space for customers
Related Link
Takamatsu No.2 Data Center

Location
- Kagawa, Japan
- 30-minute drive from Takamatsu Airport
- 30-minute drive from JR Takamatsu station
Features and Benefits
Purpose-built Data Center
Takamatsu No.2 Data Center is purpose-built, self-designed large-scale data center.
DR Site
It is loacted in low risk area of natural disaster such as flood and earthquake. The Data Center is seismically isolated structure able to withstand earthquakes of intensity level 7.
High-quality
Data center floor is capable of high-density installation of the latest ICT equipment including world-class green performance with solar power systems and external cooling systems.
Power
- Dual path
- UPS in N+2 configuration
- Gas turbine generator in N+1 configuration
- Dual power feed to each rack
- Power supply: Up to 21 kVA/rack
Air-conditioning
- Air-cooling and water-cooling system
- N+2 redundant configuration
Security
- IC card authentication
- Metal detector
- Anti-tailgating system
Certification
- ISO 27001 (ISMS)
- ISO 20000 certified
Other facilities
- Meeting room
- Parking space
Related Link